2021-084 BARNSTABLE HIGH SCHOOL /BARNSTABLE INTERMEDIATE SCHOOL ROOF TOP UNITY VENTILATOR REPLACEMENT

View all

Project

Multi-phased plan to replace and upgrade existing RTU at BHS & BIS, (BHS RTU’s 1,2,3 & 10).

Existing RTU’s at both locations are greater than 20 years old. In many
units, the air conditioning compressors have failed and replacement parts are not available leaving areas of the building without ample cooling. Additionally the chassis, frame, and cabinet components of the units are deteriorating allowing infiltration into the unit causing eventual leaks within the building.

To be funded by $3,205,000 of the March 2022 Bonds - 6.05% of the 2021 Capital Budget