2019-093 Barnstable High School Sports Fields Engineering and Upgrades

This project is a continuation of a 3 phase plan to improve the athletic playing fields at Barnstable High School (BHS). The FY20 appropriation would be used for the engineering and planning segment of Phase 2 Field Improvements. This phase includes improvement to the varsity softball, junior varsity baseball field (s) and practice soccer/field hockey/lacrosse fields. The work would consist of leveling/grading/reorientation of current fields and improvements to natural turf surfaces and irrigation system.

To be funded by $250,000 of the February 2020 Bonds - 0.73% of the 2020 Capital Budget

2019-094 Districtwide Communication, Video Surveillance, and Entry Improvements

This is a multi-year project, which includes upgrades and improvements to district telephone, video surveillance, and door entry systems. The upgrades would include centralized VOIP telephone systems and integrated video surveillance/door entry systems. The new systems will be designed to operate on the district’s network. Initially our efforts will focus on the district phone system followed by surveillance and entry.

To be funded by $500,000 of the February 2020 Bonds - 1.45% of the 2020 Capital Budget

2019-096 Campus Wide Mechanical Upgrades

Districtwide mechanical system upgrades to include boilers, burners, and pumps at all school owned buildings including Osterville and Cotuit.

To be funded by $250,000 of the February 2020 Bonds - 0.73% of the 2020 Capital Budget

2019-097 Barnstable High School (BHS) Environmental Lab

Design and construction for addition of Marine Environmental Lab at BHS. The lab would be located using two outside classrooms (1505 & 1506). The facility would include the necessary equipment, ( water tanks, pumps, filters, tables and HVAC )

To be funded by $1,000,000 of the February 2020 Bonds - 2.91% of the 2020 Capital Budget

2019-098 Barnstable High School (BHS) & Barnstable Intermediate School (BIS) Roof Top Unit Ventilator Replacement

Existing RTU’s at both locations are greater than 20 years old. In many units, the air conditioning compressors have failed and replacement parts are not available, leaving areas of the building without ample cooling. Additionally the chassis, frame, and cabinet components of the units are deteriorating, which is allowing infiltration into the unit causing eventual leaks within the building.

To be funded by $1,500,000 of the February 2020 Bonds - 4.36% of the 2020 Capital Budget

2019-099 Centerville Elementary School Unit Ventilator Upgrades, Phase 4

Current units are 50 + years old, failing, and are not operating to American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE), and Department of Elementary and Secondary Education (DES) standards.

To be funded by $500,000 of the February 2020 Bonds - 1.45% of the 2020 Capital Budget

2019-101 Hyannis West Elementary Roof Replacement

Replace existing shingled roof. Existing roof is > 20 years old and is nearing end of life.

To be funded by $450,000 of the February 2020 Bonds - 1.31% of the 2020 Capital Budget

2019-102 Centerville Elementary Roof Replacement

Replace existing shingled roof. Existing roof is > 20 years old and is nearing end of life.

To be funded by $250,000 of the February 2020 Bonds - 0.73% of the 2020 Capital Budget

2019-109 Repair & Extend Mary Dunn Way from Steampship Authority Parking Area

This proposed two-phased project will provide an improved Airport Access Road on the East side of the airfield and will respond to a number of actions and objectives to meet target goals. Each phase will be handled as a separate project. Phase I (the subject of this project) will include the area from Mary Dunn Way at the current parking lot leased to the Steamship Authority to the current Gate Mike (M). This stretch of road has a mix of failing asphalt and drainage (a number of flooding events have made the road impassible) with potholes and narrow lanes. Phase II will provide an Airport Access Road on the East side of the airfield from the current Gate Mike (M). Phase I design and permitting is complete (with the exception of sanitary sewer) as it was subject to a previous capital project that was deferred. The existing surface of the Phase II project is an unimproved dirt road with millings from rubblization of past pavement projects used as a base. Phase I will include the installation of new pavement, security fence and drainage improvements. It will also incorporate existing utilities as well as an extension of those utilities including sanitary sewer to serve potential future hangar buildings as may be permitted.

To be funded by $1,000,000 of the February 2020 Bonds - 2.91% of the 2020 Capital Budget

2019-115 Improvements to HYCC Flat Roof, HVAC Controls, and Parking Lot

The Hyannis Youth and Community Center was Completed in 2008. This project has been divided into multiple years of work, each addressing specific elements of repair as identified by consultants. Some of the repairs may yet to be discovered. Design for all years of work discussed here is currently being completed. Issues that need to be addressed include metal roofing, membrane roofing, flat roofing, rubber floors, HVAC controls, drinking fountains, grease traps, kitchen equipment, floor tile replacements, and other items. FY20 work will address issues brought forward from the facilities management plan and consist of ADA parking improvements including some paver replacements, flat roof repairs, metal roof repair, HVAC control replacements.

To be funded by $528,333 of the February 2020 Bonds - 1.54% of the 2020 Capital Budget

2019-115 Improvements to HYCC Security

This project will fund security improvements at the Hyannis Youth and Community Center by providing design and construction funding to install a new, secure office for police presence on site. Currently police are stationed in a room in the center of the facility next to the entrance. This location has no monitoring capabilities and does not have a private entrance.

To be funded by $150,667 of the February 2020 Bonds - 0.44% of the 2020 Capital Budget

2019-116 Beach Parking Lot Rehabilitation

Project would include providing a level and overlay of pavement to Craigville Beach and new line striping. The existing pavement has deteriorated such that rehabilitation is necessary. In some places, the pavement condition may be difficult or unsafe for some pedestrians.

To be funded by $160,000 of the February 2020 Bonds - 0.47% of the 2020 Capital Budget

2019-116 Beach House Improvements

This project would fund improvements at the Town’s Beach Houses. This multi-year project is a continuation of a beach program to keep bathhouses updated on the interior & exterior, and be fully operational. FY20 work will consist of final phase design and construction upgrades to the Craigville Beach House facility. Improvements will include the expansion of the first aid area, relocation of the office area to the first floor, structural improvements, staff area improvements, and improvements to staff area access to the beach.

To be funded by $255,000 of the February 2020 Bonds - 0.74% of the 2020 Capital Budget

2019-117 Marstons Mills Tennis Court Improvements

Replace six failed tennis courts with four new tennis courts and dedicated six pickle ball courts. Improvements will include replacement of new nets and posts, surfacing, coatings, and repair of fencing. Courts will be replaced with post-tensioned concrete courts, which have a much longer life expectancy than asphalt.

To be funded by $620,000 of the February 2020 Bonds - 1.80% of the 2020 Capital Budget

2019-118 Hyannis Golf Course Restoration - Cart Path System Replacement

This project will restore and modernize the Hyannis Golf course. The project calls for the replacement of the irrigation system, sand bunker renovation, construction of forward tees, refurbishment of existing cart paths and construction of paths where none currently exist, select tree removal, and widening of fairways. This “phased” version represents the 6th year a CIP has been submitted for this project. Phase 1 replaces the cart path system as it represents an ongoing safety hazard.

To be funded by $446,000 of the February 2020 Bonds - 1.30% of the 2020 Capital Budget

2019-119 Channel Dredging Program

This project involves the ongoing design, permitting, and maintenance dredging of Town-owned navigational channels.

To be funded by $1,730,000 of the February 2020 Bonds - 5.03% of the 2020 Capital Budget

2019-122 Public Bridge Improvements and Repairs

Maintenance and repairs for the bridges listed above, which are owned by the Town of Barnstable (or co-owned with neighboring towns) and are inspected by MassDOT. This predominantly involves specialized maintenance and repairs that Public Works Highway Division cannot readily perform, including but not limited to repairing or replacing structural elements, railings, concrete decking, and sidewalks, correcting scour at bridge abutments, replacing expansion joints, repairing or replacing railings, etc.

To be funded by $500,000 of the February 2020 Bonds - 1.45% of the 2020 Capital Budget

2019-124 Bumps River Bridge Repairs

Repairs to the bridge pilings, deck, rails, and other elements. Inspections by MassDOT and analyses performed by our consultant have identified necessary maintenance and safety repairs.

To be funded by $900,000 of the February 2020 Bonds - 2.62% of the 2020 Capital Budget

2019-125 Sidewalk Overlay and Guardrail

The project funds the removal and replacement of 6,000 linear feet of old deteriorated concrete post and steel cable guardrails; and the repair of existing sidewalks. The Town of Barnstable has approximately 9.2 miles of guardrail, much of which does not meet the Manual on Uniform Traffic Control Devices (MUTCD) standards that needs replacing. It consists of concrete posts, steel cables, which are highly deteriorated. Additionally, the sidewalks throughout the Town are overgrown with vegetation, narrowing, heaving with roots, and are deteriorating. This is causing numerous trip hazards. The sidewalks are difficult to maintain during snow and ice.

To be funded by $314,000 of the February 2020 Bonds - 0.91% of the 2020 Capital Budget

2019-128 Crosswalk Improvements

Town-wide efforts to improve pedestrian safety at crosswalks with features such as, but not limited to, traffic signals where warranted, rapid flashing beacon signs, curb extensions, medians, and other measures as appropriate. Also, bring crosswalks up to Town and State standards, including accessibility requirements. There have been serious pedestrian injuries or even fatalities at some locations in Town. A number of other capital projects and Chapter 90 projects include pedestrian safety and access improvements; the capital project request is to address locations where pedestrian improvements are not underway or planned in the near future.

To be funded by $300,000 of the February 2020 Bonds - 0.87% of the 2020 Capital Budget

2019-129 Town Hall Security Improvements

Phased implementation of the recommendations contained within the Internal Security Evaluation. The FY20 work includes: • Issue all Town Employees a picture ID card that also acts as a door lock access card, with associated pass-code, • Install door lock readers on external and internal control doors for use with the ID cards, • Create a location for the greeter position in Town Hall. This will require converting the small information room that is located on the left as one enters the building from the main entrance, • Rework access to the Town Clerk’s office window to allow citizens to interact with the clerk’s office employees without physically entering the space, • Refit the Tax Collector’s window with ballistic resistant glass, • Rework/replace the exit doors so all entrances to the building, with the exception of the main entrance, are locked, monitored by a video camera (see FY19 recommendations), and only accessible from the outside by employees with an ID card and pass code, • Install internal security doors on the main floor as appropriate, • Modify the elevator so the general public cannot proceed beyond the second floor without an ID card, • Install security doors to prevent the general public from proceeding beyond the second floor without an ID card; and • Other related security measures.

To be funded by $480,000 of the February 2020 Bonds - 1.40% of the 2020 Capital Budget

2019-131 Sewer System Evaluation Surveys

As a follow up to the town’s 2017 Infiltration and Inflow Analysis, this project involves targeted evaluations in order to locate and identify specific sources of infiltration and inflow (I/I) entering the town’s sewer system. This project includes flow isolation and TV inspection of up to 14,415 linear feet of sewer, 475 manhole inspections, smoke testing of up to 142,600 linear feet of sewer, dyed water testing of up to 50 locations within the collection system and dyed flooding to be carried out in conjunction with Closed Circuit Television (CCTV) inspections.

To be funded by $380,000 of the February 2020 Bonds - 1.10% of the 2020 Capital Budget

2019-132 Pump Station Rehabilitation Program

The Rendezvous Lane Pump Station was constructed in 1975, and is past the end of its design life. The station operates using outdated technology, which uses compressed air to eject sewage from the pump station through a force main and into the receiving sewers on Route 6A. The pump station and its electrical components are located well below the 100-year flood zone elevation, and in recent years, the area surrounding the Rendezvous Lane Pump Station has become completely inundated with floodwater on several occasions. In January of 2017, seawater infiltrated the pump station creating major electrical and mechanical issues. WPCD staff worked through freezing temperatures for several weeks to restore the station to proper working order. It is only a matter of time before another similar flooding event occurs, as these flooding events have been occurring more frequently in recent years. In addition to these issues, the Rendezvous Lane Pump Station has no on-site backup generator and requires a portable generator to restore the station during power outages. Unfortunately, the station is impossible to access when the area is inundated with floodwaters. As part of the WPCD Pump Station rehabilitation program, this project has been fast tracked as a top priority due to the likelihood of failure (extremely high), and the consequence of failure (sewage backing up into homes or into Barnstable Harbor). The new station will be designed for maximum coastal resiliency, moving all vital components outside of the 100-year flood zone.

To be funded by $1,160,000 of the February 2020 Bonds - 3.37% of the 2020 Capital Budget

2019-133 Bearse's Way Vacuum Sewer Replacement

This project includes the replacement of 2,380 feet of vacuum sewer on Bearse’s Way with traditional gravity sewer. This project also includes extending the future effluent disposal force main from the corner of Pitchers Way and Bearse’s Way to the WPCF property line. This project also carries funds to construct a new water connection to the WPCF. This project is to be carried out along with the upcoming Mass DOT Bearse’s Way Shared Use Path construction, allowing for savings on project costs.

To be funded by $1,130,000 of the February 2020 Bonds - 3.27% of the 2020 Capital Budget

2019-134 South Street Sewer Rehabilitation

This project funds the first two phases of construction for the South Street sewer rehabilitation project, which seeks to improve the condition and capacity of South Street sewers. Phase 1 involves the replacement of the existing clay gravity sewer main between High School Road and Old Colony Road with a new larger PVC sewer main and replacement of all sewer laterals in this area to the lot line. Phase 1 also includes the relocation of the Kalmus Beach Pump Station force main discharge in order to free up additional capacity on South Street. Phase 2 of this project includes the replacement of the existing clay gravity sewer main between Old Colony Road and School Street with a new larger PVC sewer main and replacement of all laterals in this area to the lot line. Both phases carry funds for survey work, the replacement of disturbed water and drainage infrastructure, and a full width mill and overlay of the road surface. Phase 3 is anticipated to involve the relining of sewers between High School Road and Sea Street and will be carried out later.

To be funded by $4,019,000 of the February 2020 Bonds - 11.68% of the 2020 Capital Budget

2019-135 Pipe Replacement and Upgrade Program

This is a continuation of a 30 year, phased, pipe replacement and upgrade program for the Hyannis Water System; as recommended by Weston & Sampson Engineering, Inc. in their April 2007 Master Plan. It is important to implement a structured program to replace and upgrade the water pipes in the distribution system, some of which are over 100 years old. This program is in addition to the routine maintenance and repair program to be performed by the contracted water system operator. The proposed capital budget for this pipe replacement and upgrade program is $1,050,000 per year, and includes a capitally funded water works project manager to oversee and implement this program. This continuing project will ensure the long-term ability of the Hyannis Water System to provide sufficient drinking water and fire readiness protection for all its customers.

To be funded by $1,050,000 of the February 2020 Bonds - 3.05% of the 2020 Capital Budget

2019-146 Osterville Recreation Building Design & Construction

Construction / restoration of new softball field and outdoor street hockey/basketball court. Future funding will construct the new recreation building, stage, public restrooms, additional parking, playground, and multipurpose fields. The existing recreation building and site elements have reached the end of their useful life and are beyond repair. Site and new building plans have been developed through schematic design and approved by the Osterville Civic Association. Funds were appropriated in FY17 for demolition of the Bay School and recreation building. The Bay School building has been demolished and two new tennis courts constructed in its location. This request continues the process of restoring the site and constructing a new facility.

To be funded by $797,000 of the February 2020 Bonds - 2.32% of the 2020 Capital Budget

2019-147 Commerce Road Improvements

This project is for design and permitting of solutions recommended by a study conducted by the Woods Hole Group, looking at ways to mitigate coastal flooding associated with sever tidal events and storms. Additionally, it is for the design and permitting of solutions looking at neighborhood egress, and ways to increase the ability of residents to evacuate the neighborhood when flooding does occur. The report’s findings are still being completed as of this writing. It is expected that measures such as, but not limited to, replacing the Maraspin Creek culvert and raising the road at that location, installing berms and/or raising the road along other sections of Commerce Road, installing a tide gate at the Maraspin Creek Bridge, and/or other measures will be included in i

To be funded by $300,000 of the February 2020 Bonds - 0.87% of the 2020 Capital Budget

2019-148 School Administration Building Mechanical Cooling

Phase II construction funding for School Administration Building system upgrades, including: • Mechanical/Headend upgrades at Lower Level, • Emergency generator, cooling plant, sprinkler and hot water system equipment replacement, • Renovation and expansion of the existing basement mechanical room and egress paths to accommodate a replacement emergency generator and replacement of the 30 ton cooling plant including the head-end upgrade of the sprinkler service, • Removal of the old concrete mounting pad, • Replacement of the existing electric hot water heater with a new gas fired hot water heater and thermostatic mixing valve, • Relocation of the gas service from the electric room into the mechanical room to resolve a major code violation, • Installation of new fire rated walls and ceilings throughout the basement level, including rated door improvements along the access ways. This is a public safety issue needing attention, • Limited first floor interior reorganization of space (HR), new finishes, ADA access rest room improvements and new lighting; and • Mechanical/electrical service distribution, replacement, and energy conservation improvements throughout including new electrical service, HVAC controls, ventilation, communications, plumbing and related HVAC improvements, and new elevator.

To be funded by $996,000 of the February 2020 Bonds - 2.90% of the 2020 Capital Budget

2017-099 Maher Carbon Treatment System

As the result of the final USEPA Health Advisory, the use of 3 wells at the Maher wellfield, that currently exceed the new standard, has been significantly curtailed. The Town has entered into an agreement with the Town of Yarmouth to provide water from their system through an emergency interconnection in the vicinity of the Maher wellfield. Due to the high cost of purchasing Yarmouth water (estimated at $1.25 Million annually), the DPW proposes to design and construct a carbon treatment system at the location of the Maher wellfield treatment plant; the system will be housed in a structure, allowing for year-round use. The building will be sized to accommodate an additional treatment system to be constructed next year for the removal of 1, 4-dioxane, an additional CEC, that is forcing us to purchase water from Yarmouth for blending to reduce the level below the State standard. In order to design a treatment system for 1, 4-dioxane, a pilot test must be conducted in order to determine the efficacy of treatment and the necessary component parts.

Funded by $10,925,000 of the February 2019 Bonds - 41.68% of the 2017 Capital Budget

2018-064 Barnstable High School Sports Fields Upgrades

Current varsity baseball field requires major restoration and infrastructure upgrades. The existing playing surfaces are rutted, uneven and creating safety hazards for our student athletes. This project includes construction and installation of a full size multi-use (Varsity baseball, soccer, lacrosse) synthetic turf field, rest rooms, concession stand, picnic area, dugouts with storage, lighting, improved parking and sidewalks. This project is phase 1 of a 3-phased master plan, which includes improvements, and reconfiguration of the remaining playing fields located at Barnstable High School.

Funded by $4,600,000 of the February 2019 Bonds - 17.14% of the 2019 Capital Budget

2018-076 Senior Center Renovations Sprinkler, Kitchen, and Rear Deck

The existing sprinkler system contains outdated sprinkler heads that need to be replaced as well as repairs to the existing sprinkler pipe system. The kitchen floor has been repaired a number of times to the point that replacement is required. Kitchen equipment is outdated and needs replacement. Cabinet and surfacing repairs are required. Laminated wood beams supporting the rear deck need to be replaced. Other needed improvements will be incorporated as well.

Funded by $659,000 of the February 2019 Bonds - 2.71% of the 2019 Capital Budget

2018-081 Pipe Replacement and Upgrade Program

This is a continuation of a 30-year, phased, pipe replacement and upgrade program for the Hyannis Water System; as recommended by Weston & Sampson Engineering, Inc. in their April 2007 Master Plan.

Funded by $1,050,000 of the February 2019 Bonds - 3.91% of the 2019 Capital Budget

2018-092 School Administration Building Mechanical Cooling Upgrades

Renovation and expansion of the existing basement mechanical room and egress paths to accommodate a replacement emergency generator and replacement of the 30-ton cooling plant including the head-end upgrade of the sprinkler service. The building condition study indicates the need for significant head-end mechanical and accessibility improvements. If left as is, further deterioration will occur with increased scope of mechanical repairs resulting in additional inflation and restoration cost.

Funded by $285,000 of the February 2019 Bonds - 1.06% of the 2019 Capital Budget

2018-094 Martsons Mills Elementary School Improvements

The three portable / modular structures located at the facility are joined to the main building by a covered hallway. These structures are in excess of twenty-five years old and have completely outlived their useful lives. As they sit and deteriorate due to insect infestation and non-use. They have become a nuisance and continue to attract vandals. The space is not salvageable and they need to be removed. The project involves the design, permitting, abatement, disconnection, labor and disposal fees to demolish and dispose of the temporary structures. Part of the work will include hazardous materials testing and evaluation of the existing school building. Additional work will be accomplished as required based on discovered conditions during evaluation and demolition.

Funded by $253,740 of the February 2019 Bonds - 0.95% of the 2019 Capital Budget

2018-096 Armory Building Improvements

This project will fund the renovation of the Armory. The work will be accomplished in phases to allow the Town maximum flexibility regarding its ultimate usage. The phases will proceed as follows. There has been a long, unsuccessful, history trying to find a suitable tenant for this facility, with one of the main deterrents being its existing condition. This project arrests that deterioration, and gives the Town flexibility regarding its ultimate use. If the Town chooses the municipal solution it would leverage the Armory’s unique location (adjacent to existing Town Campus) to provide key Town offices that are one level, ADA friendly, and easily accessible by the public. The remainder of Town Hall can then have additional security measures placed on it to protect those employees that do not need routine public access. If the Town elects to not pursue this series of CIPs, but instead demolish the facility that has been estimated to cost approximately $1,300,000, and then someone will have to pay to develop the empty lot.